Mischief Managed

August literally started off with a bang. At 2:35 am on the 1rst someone backed up a truck to our single car port garage door and bent it in. Ugh! Zach rush down the stairs and woke us up, but we figure the crumpling aluminum must have perturbed our slumber and nudged us out of... Continue Reading →

Château Enginerd: Month 3

Time flies and in an instant, all you are left us with the memories. Being able to take a two person shower without bumping with the walls was well worth the wait. Knowing we won't need to remodel any time soon to get the look and feel we want, priceless. Zach is enjoying his big... Continue Reading →

Château Enginerd, Month 2

It has been two months since we moved to our new home and the upgrades and updates are almost completed on the inside. Check out the Master Closet Under $500 DIY, the Industrial TP holders, the pantry update and the light switch replacement for more info. We are still waiting on the inspection for the... Continue Reading →

Down to two boxes…

Moving was not as hard as people were telling me BUT unpacking was HELL. Good news, we didn't have to trash or donate too much of the stuff; it was worth the hassle of packing it since we now have the time and space for a garage sale. Bad news, now we need to do... Continue Reading →

Château Enginerd: Let There Be Sewer

As of 1/31/2017, Château Enginerd cleared its biggest bottleneck and has sewer! Once the dust settles the yard will be leveled, the water meter dropped in and the electrical wiring bought off. If all goes well the new home will be liveable by this weekend and ours by 2/9!!!! Hopefully our builder is as excited... Continue Reading →

Blog at WordPress.com.

Up ↑

%d bloggers like this: